Pre-Flight B-RID Testing and Troubleshooting

Verified from official sources
Section 2.4Version 1Effective -Verified 31 August 2026

In plain language

Before flying, perform the recommended B-RID checks (shake test, balance check, and system error check). If you encounter any unresolved errors or issues, do not fly the drone.

Requirement as structured

CAAS states that operators must perform pre-flight test steps (including a physical security shake test, CG balance check, and system error check) and must not proceed with flight operations if any B-RID or UA system error persists.

Original regulatory text

With the B-RID module attached, shake the UA to ensure that the attachment is secure... Locate the Centre of Gravity (CG) of your UA... Check that the B-RID module is not indicating any system error or fault... If the issue persists, do not proceed with the UA operations until the issue has been rectified.