Development of a Notional Concept of Operations
Verified from official sourcesAC 922-001 Section (2), (3), (4)Version 1Effective -Verified 23 August 2026
In plain language
A Notional CONOPS must be developed to define the average operation and help analyze system failures.
Requirement as structured
Applicants should develop a Notional Concept of Operations (CONOPS) as the first step to show compliance with CAR Standard 922.07.
Original regulatory text
The first step in showing compliance to this standard will require the development of a Notional Concept of Operations. This will determine the expected “average operation", and to inform the criticality classifications of the system.
Applies when
- country
- Canada
- regulatory category
- Specific