Calculation of Air Risk Buffer for UTR Areas

Verified from official sources
Članak 8. stavak 7. točka c)Version 2Effective -Verified 25 August 2026

In plain language

When applying for a UTR (UAS airspace reservation), you must calculate and include both the operational volume and the protective safety buffer (Air Risk Buffer) within the total requested airspace volume.

Requirement as structured

When submitting a request to establish a UTR area, the user must include and indicate in the total volume of the structure the operational and protective volume (Air Risk Buffer) for unmanned aircraft flight operations.

Original regulatory text

UTR područje predstavlja volumen zračnog prostora koji u sebi sadrži operativni i zaštitni volumen za izvođenje letačkih operacija bespilotnim zrakoplovima (Air Risk Buffer), koji je korisnik dužan uračunati i naznačiti u ukupnom volumenu strukture prilikom predaje zahtjeva.