Timing and Signing of Test Flight Records
Verified from official sources11.04(2)Version 1Effective -Verified 25 August 2026
In plain language
You must sign and date the test flight record as soon as possible after the flight is finished.
Requirement as structured
The operator must prepare, sign, and date the test flight record as soon as possible after the flight is completed.
Original regulatory text
(2) The relevant operator must prepare the record as soon as possible after the test flight is completed, and must sign and date the record.